Contractors and applicators

Bid it, submit it, turn it over on schedule.

Submittal packages prepared for your project, commercial application instructions, the numbers you schedule around, and a manufacturer that picks up the phone.

1 hourMinimum time between Floor Shield coats
24 hoursFloor Shield to vehicle traffic
100 sq ftPer gallon, Rhino Shield finish at 16 wet mils

Application data

The numbers you schedule around

Floor Shield-W Color HS and Clear Coat HS

Mix ratio1 part A to 1 part B by volume
Working timeUp to 25 minutes; shorter when hot and humid
Dry film thickness2 to 10 mils per coat
Recoat1 hour minimum; 48 hours maximum, then contact AmCoat
Foot traffic4 to 5 hours typical; 2 hours minimum
Vehicle traffic24 hours
Application temperature0°F to 100°F
VOC0

Times at 70°F and 50% RH.

Rhino Shield DFC finish coat

Spread rate100 sq ft per gallon at 16 wet mils
ApplicationSpray; roll or brush where approved, in at least two coats
PrimerBy substrate: APS, Cement Board Primer or Red Iron Oxide
Full cure5 to 7 days
TemperatureNot below 40°F, surface or ambient
Existing coatingsAdhesion tape test, ASTM D3359, 4A minimum
VOC42 grams per liter
ThinningDo not thin

Data at 77°F and 50% RH.

Preparation

The prep that protects the warranty

The commercial application instructions replace the residential manuals in every submittal. They are written for an active job site, and the warranty depends on following them.

Request the instructions
Applicator sealing a decorative flake floor
Sealing decorative flakes
Slab moisture
Tested by ASTM F1869 and ASTM F2170 before Floor Shield goes down
Profile
Diamond ground to CSP 2; CSP 3 under vehicle pads
Grinders
4 hp, 20 inch and 300 lb minimum
Film build
16 wet mils maximum per Floor Shield coat
Walls
Site control and overspray protection, inspection, cleaning and repairs before primer

How a project runs

From specification to closeout

  1. Specify

    Editable guide specification sections and technical answers for the design team.

  2. Submit

    A submittal keyed to the specification: transmittal, statement of compliance and eight tabs.

  3. Test and mock up

    Slab moisture testing, adhesion pull tests and mockups before full production.

  4. Install

    An approved applicator works to the commercial application instructions.

  5. Close out

    The warranty is completed for the project, with the recorded moisture and adhesion readings.

Approved applicators

Install it, and stand behind it with us

The warranty requires an approved applicator. Floor Shield applicators complete a one day training class.

Become an approved applicator